How it was built

Three years, five prototypes,
one machine

Three years of development: from rough sketches and reference photos, through one prototype after another, to the final master ready for batch production.

08 chaptersScroll through the build
012023 · Concept
Sketching on top of the first CAD

Where it started

Sketching on top of the first CAD

The first design sessions: printed CAD views covered in hand-drawn sketches, trying out dozens of silhouettes for the head, the pedestal and the steam wand.

022024 · Prototype P1
Bare metal, the first chassis

Proportions get real

Bare metal, the first chassis

A folded sheet-metal frame, a stainless drip deck and a 3D-printed jig standing in for the display bezel. Nothing works yet, but the proportions are real for the first time.

032024 · Prototype P2
First body, first face

The silhouette appears

First body, first face

The black shell goes on, with the display cutout, the side vent slots and the clear water tank behind the column. This is where ELLA stops being a drawing.

04March 2025 · Prototype P2
First espresso, live on screen

Hardware meets interface

First espresso, live on screen

The round interface running for real at 93 °C with a live brew timer, while the first profiled shot pours from the group head.

052025 · Prototype P3
Colour, and a second skin

Tooling locked

Colour, and a second skin

Side by side on the workbench: a fresh white powder-coated shell next to the assembled black P4. Panel gaps, internal vent geometry and the chamfered drip tray corners are now final.

06October 2025 · In public
Frankfurt Coffee Festival

Meeting the community

Frankfurt Coffee Festival

Pulling shots on black and white ELLA 2Bs in public for the first time. Hundreds of visitors got their hands on the machine, and their feedback went straight into the final revision.

07March 2026 · Prototype P5
Ready for the Golden Master

The last prototype

Ready for the Golden Master

Finished in March 2026 and used every day since, it delivers stable, consistent results shot after shot.

08August 2026 · Golden Master
The 20-machine mini batch

Assembly has started

The 20-machine mini batch

In August 2026 we started building the first mini batch of 20 ELLA 2B machines. They will go to selected promoters and distributors for review ahead of the Kickstarter campaign.

Where we are now

Twenty machines on the bench.
One campaign behind the curtain.

The Golden Master is finished and the first small batch is being built by hand. Next up is the Kickstarter launch in Q1 2027. Join the Early Bird list to be the first through the curtain.

Years in development
3
Prototypes
5
Machines in the first batch
20
Kickstarter launch
Q1 2027
Join the Early Bird